hard rock tunnel boring machine

基本解釋巖石隧道鉆挖機(jī)

網(wǎng)絡(luò)釋義

1)hard rock tunnel boring machine,巖石隧道鉆挖機(jī)2)The rock was caverned out to make a tunnel.,挖空巖石造隧道。3)The rock was caverned out to make a tunnel,挖出巖石造隧道。4)bored tunnel,鉆挖的隧道5)hard rock tunnel boring machine,巖石隧道掘進(jìn)機(jī)6)rock tunnel,巖石隧道

用法和例句

Construction measurement technology of rock tunnel;

淺談巖石隧道施工測(cè)量技術(shù)

The shallow analysis of the measures in soft rock tunnel water prevention;

寒區(qū)巖石隧道防水措施淺析

Therefore, in the study of cold region rock tunnel, to avoid and reduce freezing damage,the key issue is to study the occurance、expansion and the prevention of the frost heaving force.

利用ANSYS有限元對(duì)寒區(qū)隧道凍脹力進(jìn)行了數(shù)值模擬,通過(guò)對(duì)理論計(jì)算結(jié)果和數(shù)值模擬結(jié)果的比較分析,提出寒區(qū)隧道凍脹力的基本防治措施,對(duì)寒區(qū)巖石隧道工程的設(shè)計(jì)和施工具有指導(dǎo)意義。

Study of Cutter Layout Design of Full-face Rock Tunnel Boring Machine

全斷面巖石隧道掘進(jìn)機(jī)刀盤(pán)刀具布置方法研究

Structure Analysis on Rock Tunnel Boring Machine Pipe Liner;

巖石掘進(jìn)機(jī)隧道管片襯砌的結(jié)構(gòu)分析

Mechanical Analysis for Main Frame of Railway Soft Rock Tunnel Roadheader;

鐵路軟巖隧道臂式掘進(jìn)機(jī)主機(jī)架力學(xué)特性分析

Study on Mechanical Behavior of Metro Tunnel Construction by Tunnelling Machine in Weak-Broken Surrounding Rock

軟弱破碎圍巖地鐵隧道掘進(jìn)機(jī)施工力學(xué)研究

coal or rock cutter and tunneling machinery ,self-propelled

截煤或截石機(jī)和隧道挖掘機(jī)械,自動(dòng)推進(jìn)

coal or rock cutter and tunneling machinery ,not self-propelled

截煤或截石機(jī)和隧道挖掘機(jī)械,非自動(dòng)推進(jìn)式

On construction of TBM machine in tunnel

淺談?dòng)矌r雙護(hù)盾掘進(jìn)機(jī)(TBM)隧洞施工

pattern recognition of full face TBM boring performance

全斷面隧道掘進(jìn)機(jī)掘進(jìn)狀況分類識(shí)別研究

Study on Pattern Recognization of Tbm Boring Performance of Qinling Tunnel;

秦嶺隧道全斷面掘進(jìn)機(jī)掘進(jìn)狀況識(shí)別分析研究

Fuzzy identification of surrounding rock conditions based on analysis of shield tunneling data

基于盾構(gòu)掘進(jìn)參數(shù)分析的隧道圍巖模糊判別

Operation principle analysis of disc cutter on TBM

隧道掘進(jìn)機(jī)盤(pán)形滾刀的工作原理分析

Alteration of Control System for Power of TB880E-type TBM

TB880E型隧道掘進(jìn)機(jī)控制系統(tǒng)電源改造

Study on the Consecutive Boring Principle of the Open Type Full Face Rock Tunnel Boring Machine;

敞開(kāi)式全斷面巖石掘進(jìn)機(jī)連續(xù)掘進(jìn)原理的研究

Investigation of rock cutting mechanism of disc cutter of fullface development machine

全斷面巖石掘進(jìn)機(jī)盤(pán)形滾刀破巖機(jī)理的探討

Improvement of Motor Waterproof of Dust-exhaust System of TB880E-type TBM

TB880E型隧道掘進(jìn)機(jī)除塵系統(tǒng)電機(jī)防水的改進(jìn)

Shields that are modification of the one that Brunel developed for boring the Thames Tunnel are used in excavating through clay or soft rock.

布魯內(nèi)爾在挖掘泰晤士河隧道時(shí)所發(fā)明的盾構(gòu)加以改進(jìn)后用于在粘土和軟巖地帶挖掘隧道。

Set up the TBM Industries for Promoting the Underground Space Development in China

建立隧道掘進(jìn)機(jī)產(chǎn)業(yè) 促進(jìn)我國(guó)地下空間開(kāi)發(fā)

Theoretical Analysis of Special Section Tunnel Cutting Mechanism of Shield Machine;

盾構(gòu)掘進(jìn)機(jī)異形斷面隧道切削機(jī)構(gòu)的理論研究

最新行業(yè)英語(yǔ)

行業(yè)英語(yǔ)