The model was to forecast the break-up date of the station on the Songhua River,based on the mechanism of the break-up and the ice condition statistics of the station.
依據(jù)開河機(jī)理,結(jié)合松花江某水文站的歷史資料,建立了該站開河日期預(yù)報(bào)的BP神經(jīng)網(wǎng)絡(luò)模型。
The application of this new approach in forecasting the freeze-up and break-up date of the Inner Mongolia reach of the Yello.
在分析凌汛成因影響因素的基礎(chǔ)上,選取合適的預(yù)報(bào)因子,基于模糊優(yōu)選神經(jīng)網(wǎng)絡(luò)BP模型,對(duì)黃河內(nèi)蒙段封河、開河日期進(jìn)行樣本訓(xùn)練和預(yù)報(bào)方案驗(yàn)證。
This method is applied to forecast the freeze-up date and break-up date of the Yellow River.
本文在分析影響凌汛成因因素的基礎(chǔ)上,選取合適的預(yù)報(bào)因子,基于模糊優(yōu)選神經(jīng)網(wǎng)絡(luò)BP模型,提出冰凌預(yù)報(bào)方法,應(yīng)用于黃河內(nèi)蒙段封河、開河日期的預(yù)報(bào)。
I remeber one point, the data date is same as your project start date.
我想起一點(diǎn),數(shù)據(jù)日期與項(xiàng)目開工日期是同一天。
The factory is closed until further notice.
工廠已經(jīng)關(guān)閉,開工日期另行通知。
"Commencement Date"means the date upon which the Contractor receives the notice to commence issued by the Engineer"
開工日期是指承包商接到工程師根據(jù)本合同發(fā)出開工通知書的日期。
"Between three and five hundred workers to be discharged, then," began Wang Ho-fu, summing up, "Sunday overtime to be abolished;
“開除工人,三百到五百; 取消星期日加工;
The recurrence start date doesn't correspond to the recurrence pattern. Change the recurrence start date from a weekend day to a weekday.
重復(fù)周期的開始日期不符合定期模式。將重復(fù)周期的開始日期從周末更改為工作日。
Japan’s Short-term Objective in Developing New Wood Processing Technology;
日本木材工業(yè)新技術(shù)開發(fā)的近期目標(biāo)
The said Effective Date shall be construed as the date of the commencement of work hereunder.
上述生效日期即為本協(xié)議規(guī)定的開始工作之日。
No efforts will be spared to complete the preparatory work for the south-to-north water diversion project, in order to start the project as quickly as possible.
抓緊“南水北調(diào)”的前期工作,力爭(zhēng)早日開工建設(shè)。
Work on Mongolia People Done by the CPC during the Anti-Japanese War;
抗日戰(zhàn)爭(zhēng)時(shí)期中國(guó)共產(chǎn)黨開展的蒙古民族工作
Receive Location '{0}' has Start Date later than the Stop Date. Change either the Start Date or the Stop Date.
接收位置“{0}”的開始日期晚于停止日期。請(qǐng)更改開始日期或停止日期。
"Eh? Go on half time?"
“哦,哦,開半日工么?
The Employee shall work on probation for a period of forty (40) days, starting from the first workday.
雇員開始為雇主工作日起之初期四十天為試用期間。
Gantt Chart report: Name, Start Date, End Date, Duration, User-defined Number, Percent Complete -grouped by Resource
甘特圖報(bào)告:名稱、開始日期、結(jié)束日期、工期、用戶定義的數(shù)字、完成百分比-按資源分組
The date range fixed from date is after the to date
日期范圍的固定開始日期晚于完成日期
We'll bring the date of the meeting forward from the 20th to the 18th.
我們要把開會(huì)日期從20日提前到18日。
The date of the meeting was advanced from the 10th to the 3rd of June.
開會(huì)日期從6月10日提前到6月3日。
The date of the meeting was advanced from the 1 0 th to the 3 rd of June .
開會(huì)日期從六月十日提前到六月三日。
The Timeline finish date must be later than the start date.
時(shí)間線完成日期必須在開始日期之后。